2:1 purchase · 6 steps · locked with two half hitches
The loop: your pulleyStanding part, to the loadTwo half hitchesWorking endTie-down bar
The loop works as a pulley; two half hitches hold the tension.
The rope’s own pulley. Tie a fixed loop in the line, take the end round the bar and back up through the loop, haul it down tight, then lock it with two half hitches. The classic way to cinch a load down.
Loop, round the bar, up through the loop, pull down, two half hitches. Watch it once at speed, then take it exit by exit.
One exit per step · the truck follows the clip
1Rest area · before you start
One rope, one bar, a loop for a pulley
Standing part, to the loadWorking endTie-down bar
The line comes from the load on the left; the working end has to reach the bar and back.
What “2:1 purchase” means
The loop in the line acts like a pulley. When you pull the end down, your pull acts on both sides of the loop, so the line to the load is tightened with about twice the force you put in, while you pull in about twice as much rope as the line takes up. That is why a trucker’s hitch gets a line so much tighter than a plain knot.
Tie the loop where you can reach
About chest height, or wherever you can work comfortably, with enough room between the loop and the bar to haul.
Leave a long working end
The end goes to the bar, back up through the loop and down again, then into two half hitches: leave it plenty long.
A smooth anchor
A bar, hook, ring, cleat or tie-down rail. Smooth and rounded is best: the rope slides round it as you haul.
2Six exits · each clip loops
Six steps to a trucker’s hitch
EXIT 1
Make a loop in the line
10 s clip · step 1 of 6
Part way between the load and the anchor, pull a bight (a U-fold) of the line up and tie an overhand knot with it, doubled. A small fixed loop now stands on top of the line.
NoteUse a bight from the line itself, not the end: the end has to stay free to go round the bar.
EXIT 2
Open the loop
4 s clip · step 2 of 6
Snug the overhand down and open the bight above it into a clear eye, sitting on top of the line. This eye is your pulley.
NoteMake the eye roomy enough for the doubled rope to slide through it freely.
EXIT 3
Round the bar
7 s clip · step 3 of 6
Run the working end down to the bar (or a hook, ring or cleat), over and round it, and bring it back towards the loop.
NoteA smooth bar or hook lets the rope slide as you haul; a sharp edge will chafe it.
EXIT 4
Up through the loop
9 s clip · step 4 of 6
Bring the end up in front of the knot, pass it through the loop from the front, then lead it back down behind.
NoteNow the rope runs bar, loop, your hand: the loop turns it like a pulley.
EXIT 5
Pull down to tighten
5 s clip · step 5 of 6
Haul the end down towards the bar. The loop works like a pulley, so the line to the load tightens with about twice your pull.
NotePinch the end against the bar to hold the tension while you tie it off.
EXIT 6
Two half hitches
10 s clip · step 6 of 6
Keeping the tension, take the end round both lines just above the bar and tuck it through, twice: two half hitches lock it.
NoteSnug each hitch down against the bar before you let go of the pull.
You have arrived: a tight line, locked at the bar
3Weigh station · check the load
Tight line, locked with two half hitches
Inspection All loads
4Alternate routes · variants
Quick releases and extra purchase
Instead of step 1
A slipped loop
Instead of the fixed overhand loop, tie a slipped loop (a slip knot, or a bight pulled through a twist). Tie it so the pull from the load holds it closed: it stays put while the line is tight, and once the line is slack a tug on the tail collapses it, so the whole hitch comes down in seconds.
A slipped loop releases with a tug once the line is slack
Instead of step 6
A slipped half hitch
For the lock, tuck a bight of the end through instead of the end itself on the last half hitch. One pull on the tail undoes it, which is handy for loads you tighten and untie often, like a tarp or a boat cover.
A bight tucked through on the last hitch: one tug and it’s free
More purchase
A second loop
Tie a second loop in the part of the rope that comes back from the first, and run the end through it as well. It stacks another pulley for a higher purchase in theory (3:1 or more, depending on how it is rigged), but each extra turn adds friction, so the real gain is smaller.
Two loops in series: more purchase, more rope, more friction
How the purchase works, and why it is less than 2:1
On paper, the loop is a pulley and the line gets twice your pull. But a rope loop isn’t a wheel: the rope rubs round the inside of the loop as you haul, and that friction eats part of the second half of your pull. In practice a trucker’s hitch gives somewhat less than 2:1, often around 1.5:1.
Friction also helps: it holds the tension while you tie the half hitches. A carabiner or a pulley in place of the loop brings it closer to 2:1.
None (a pulley)Typical ropeRough
Purchase
20 kg pull gives
Half-turn round the loop: line ≈ pull × (1 + e−μπ). Rough figures only.
5Interactive 3D · turn it round
Walk around the hitch in 3D
Drag to turn it, pinch in on the loop, scrub back to any step, or glow the working end to follow it round the bar, up through the loop and into the half hitches.
Live model · TH-6Drag · pinch · scrub
·Drag to turn · pinch to zoom
0:00
6Services · common uses
Common uses
Tying down a load
Cinch furniture, lumber or gear down on a truck bed, trailer or roof rack.
A tarp ridgeline
Pull a ridgeline taut between two trees so the tarp sheds rain.
Securing a canoe
Bow and stern lines from a canoe or kayak down to the car, snug and secure.
A tight clothesline
Tension a washing line between posts so it doesn’t sag under wet laundry.
7Take it with you
Keep the route card
All six exits on one card. Pin it, or keep it with your straps and tie-downs for the next load.