How to tie aTaut‑Line Hitch
A loop round the peg that you can shorten or lengthen. Slide the hitch to tension the guyline; let go and it holds.
- Type
- Adjustable loop, friction hitch
- Line
- 2–5 mm guyline cord
- Turns
- Two inside, one outside
- Adjust
- Slides by hand, holds under load
Standing part · to the tentTwo turns insideTurn outsideLoopPegLabel A · tied, snugged and slid along to tension the line
Out of the bag · 10 s
The whole hitch at 4×
- Peg
- 2 in
- 1 out
- Snug
- Slide
Round the peg and back, two turns inside the loop, one outside, then snug it and slide it to tension the line.
GuylineEndTent pegLabel B · the guyline and the peg, before the first turn
Before you start
In the bag
- 1×Guyline
Cord of 2–5 mm, tied to the tent’s guy-out loop at the far end.
- 1×End
The free end you tie with. Leave about an arm’s length past the peg.
- 1×Tent peg
Driven in leaning away from the tent, a stride or so out from it.
Step by step · each clip loops
Five steps to a taut line
-
1Step 1 of 5
8 s clipRound the peg
Take the end round the peg and back towards the tent, below the standing part. The two lines form the loop.
TIPLeave plenty of end to work with: about an arm’s length of cord.
-
2Step 2 of 5
9 s clipTwo turns inside
Wrap the end twice round the standing part, inside the loop, working towards the peg.
TIPLay each turn beside the last. Crossed turns don’t grip evenly.
-
3Step 3 of 5
9 s clipOne turn outside
Bring the end back past the two turns and make one more turn outside the loop, on the tent side. Tuck it under itself.
TIPThat last turn is a half hitch. It stops the hitch twisting round the line.
-
4Step 4 of 5
6 s clipSnug it up
Pull on the end and work all three turns tight and neat round the standing part.
TIPDress it before you load the line. Loose turns slip.
-
5Step 5 of 5
7 s clipSlide to tighten
Push the hitch along the standing part, away from the peg, to tension the line. Let go and it holds.
TIPSlide it back towards the peg whenever the line needs slack.
Before you walk away
Pitch check
Two turns in, one turn outinside the loop · then on the tent side
Adjusting the tension
Slide it, don’t retie it
To tighten
Slide the hitch away from the peg, towards the tent. The loop grows and takes up the slack.
To slacken
Slide it towards the peg. Handy when wet cord shrinks and pulls the tent out of shape.
It holds under load
A pull on the guyline bends the standing part through the turns and they grip. Push the hitch itself and it moves.
Slippery cord?
On thin, stiff or slick line, add a second outside turn or tie a stopper knot in the end.
Interactive 3D
Walk round the peg
Drag to turn it, pinch in on the turns, scrub back to any step, or glow the end to follow it round the peg and along the line.
· Drag to turn · pinch to zoom
Why learn it
Common uses
Tent and tarp guylines
Tension every guyline from the peg end, and loosen it again when the rain shrinks the cord.
Clotheslines
Tie one end round a tree or post and slide the hitch until the line stops sagging.
Loads and covers
Tie down a cover or a load and take up the slack as it settles.
Ridgelines
Set a ridgeline for a tarp or hammock and tension it without retying.
Take it with you
Pack the label
All five steps on one card. Pin it, or save it to your phone for the next time you pitch a tent.